Press Releases

Bayonne Bridge to Remain Open Most of the Weekend; Construction Work Scheduled to Begin Late Tonight Will End at 8am Saturday

The Bayonne Bridge will be closed overnight starting at 11:59 p.m. tonight, and reopening 8 a.m.tomorrow morning, Saturday, August 12. Once reopened, the bridge will remain open until 7 p.m.Monday, August 14.

Next week, the bridge will close Monday through Thursday, August 14 through 17, from 7 p.m. to 5 a.m. the following mornings for ongoing construction work. On certain overnights, the Bayonne Bridge will open by 4:30 a.m. to provide an alternate route for drivers affected by 4:30-5 a.m.holds on the Goethals Bridge. 

The Port Authority also is planning the following closures and/or lane closings at the Holland Tunnel, George Washington Bridge and Goethals Bridge this weekend and/or next week for ongoing construction and repair projects.

Sign Up for E-News

Holland Tunnel:

  • One westbound lane will close during overnight hours on Sunday, August 13, through Thursday August 17, from 11:59 p.m. each night through 5:30 a.m. the following morning.  These closings are necessary for ongoing tunnel repairs.
  • One eastbound lane will close during overnight hours on Sunday, August 13, through Thursday August 17, from 11 p.m. each night through 5 a.m. the following morning.  These closings are necessary for ongoing tunnel repairs.

George Washington Bridge:

  • The bridge’s upper level westbound lanes will have two lanes closed from 11:59 p.m. Friday, August 11, through 10 a.m. Saturday, August 12, and from 10 p.m. Saturday through 10 a.m.Sunday.
  • The left lane on the Palisades Interstate Parkway southbound ramp at the bridge will be closed from 11:59 p.m. Saturday, August 11, through 8 a.m. Saturday, August 12.

These closings are necessary for the ongoing replacement of the PIP Helix, which connects the Palisades Interstate Parkway to the George Washington Bridge, and for repairs to the bridge’s upper level over the New Jersey anchorage.  More information can be found athttp://www.panynj.gov/bridges-tunnels/restoring-the-george.html. These projects are part of the “Restoring the George” program of capital improvements at the world’s busiest bridge.

Goethals Bridge:

  • The bridge will have traffic holds between 4:30 a.m. and 5 a.m. each morning starting Monday, August 14 and running through Wednesday, August 16 to accommodate the movement of steel girders.

To receive real time traffic updates, travelers should register for Bridge and Tunnel Alerts atwww.paalerts.com, call 511 or visit www.511NY.org or www.511NJ.org.

TAP Into Another Town's News:

You May Also Be Interested In

Sign Up for E-News

Bayonne

Upcoming Events

Carousel_image_ad6c3c447b5accf3e1a1_3ef0aae34bda175becfa_ptp_save_the_date_-_p1

Fri, March 16, 7:00 PM

The Grove, Cedar Grove

Susan G. Komen North Jersey

Giving Back Other

Sat, April 28, 8:00 AM

College of St. Elizabeth, Morristown

Conference and Resource Fair Promotes Advocacy ...

Education Giving Back

How to Talk with Kids About the Florida Shooting

February 15, 2018

The tragedy of the Florida school shooting is devastating, leaving 17 killed and 15 injured. Our children can easily identify with what occurred yesterday. It will be the topic of conversation today in schools everywhere. School administrators are doing all they can to provide support and guidance. The shootings affect children, teachers, and school personnel. The school shooting ...

Rep. Payne, Jr. Issues Statement on Parkland, Florida, School Shooting

February 14, 2018

Rep. Donald M. Payne, Jr. (NJ-10) released the following statement:

“To the families who lost loved ones during a school shooting in Parkland, Florida, today, know that your country’s compassion and thoughts go out to you. Our hearts break with yours.

“To those injured, know that the American people are praying your recovery.

“To the first responders who put their ...