Shore Report

U.S. Army Corps to Begin Routine Dredging at Entrance of Shark River Inlet

c265f1b8ae1dbb4b7bec_usarmycorpsmurden.jpg
The U.S. Army Corps of Engineers’ dredge Murden will pump up to 35,000 cubic feet of sand from several areas of recurring shoals at the mouth of the Shark River Inlet. Credits: U.S. Corps of Engineers
b4881a61544e9e566167_belmarinletlookeast2spe.JPG
Beginning on January 2, the U.S. Army Corps of Engineers will perform routine dredging at the mouth of the Shark River Inlet, which is required to keep the waterway open to marine traffic. Credits: Paul Spennrath
c265f1b8ae1dbb4b7bec_usarmycorpsmurden.jpg

BELMAR, NJ — Completion of the dredging of the Shark River channels situated off the Belmar Marina will bring the start of another dredging project at the entrance of the Shark River Inlet.

Since early September, the N.J. Department of Transportation (DOT) has been removing 102,000 cubic yards of sediment to open up the western portions of the Share River Channel and Shark River Channel Spur to full depth and width, making it easier and safer for commercial and recreational boaters to navigate those waterways.

That work — the second phase of the $7.6 million project launched in 2016 by DOT after nearly two decades of delays and interruptions — will be completed on time by December 31, according to DOT spokesman Stephen Schapiro.

Sign Up for E-News

Beginning on January 2, the U.S. Army Corps of Engineers will station its dredge Murden in the outer section of the mouth of the Shark River Inlet, where up to 35,000 cubic feet of sand will be removed in several areas of recurring shoals — the 18-foot-depth channel and basins, and the 12-foot depth channel, according to William Vanterpool, project engineer for operations in the corps’ New York District.

The sand will be placed on the Avon-by-the-Sea side of the inlet in a temporary 2- to 4-foot berm situated in 14 feet of water, the corps reported.

The 15-day pumping project is part of the corps’ ongoing maintenance of the inlet, which is required to keep the waterway at depths that permit the safe passage of marine traffic. This area of the inlet was last dredged in July 2015 at a cost of $840,000, according to a corps "Federal Navigation Channel Maintenance and Stewardship" fact sheet on the Shark River.

In 2013, the corps completed a beach replenishment project along Belmar’s 1.3-mile oceanfront, in the aftermath of Superstorm Sandy in 2012.

TAPinto Belmar/Lake Como is Belmar and Lake Como’s only free daily newspaper. Accredited by the New Jersey Press Association, it is a locally owned news organization serving the community. Sign up for our free daily e-News, and follow us on Facebook and Twitter.

TAP Into Another Town's News:

You May Also Be Interested In

Sign Up for E-News

Belmar/Lake Como

Vehicular Homicide Charges for Driver of Paramus School Bus

May 24, 2018

MORRISTOWN, NJ — The driver of a school bus involved in a crash on Route 80 last week that killed two people faces two counts of second-degree vehicular homicide/death by auto, according to officials.

The driver, Hudy Muldrow, 77, of Woodland Park attempted to make an illegal u-turn on the highway in an attempt to find his way to Waterloo Village, the planned destination of the bus that ...

Upcoming Events

Carousel_image_b18f08cd84a9fc177e77_bacsummertime

Fri, May 25, 1:00 PM

Belmar Arts Center, Belmar

Summertime, Summertime

Carousel_image_7ae118156f1d20aed5df_bbppyanoeplaza4

Fri, May 25, 6:30 PM

Pyanoe Plaza, Belmar

Friday Night Concert Series: R&B Express

Carousel_image_b16a62849b07ee60898e_belmarmagicalgarden4

Sat, May 26, 9:30 AM

Belmar Magical Garden, Belmar

Belmar Magical Garden Tomato Plant Sale

Carousel_image_42ad6cce4531efa33059_belmarmemday-3

Mon, May 28, 9:30 AM

Monument Row, Belmar

Belmar Memorial Day Commemoration Ceremony

Carousel_image_81aab3f8e91ffde9a46c_pinkforapurposecollage

Thu, May 31, 7:00 PM

Sweet Tease Tea Room and Cafe and Lynette's Healing Touch, Belmar

Pink for a Purpose: A Benefit for Lin's Linens

Carousel_image_764314da7a0371aabf9e_pirateday

Sat, June 2, 9:00 AM

Eighth Avenue Beach Playground, Belmar

Belmar Pirate Day Treasure Hunt

Carousel_image_ee3b903f652168aec49f_belmaryardsalespring2018__2_

Sat, June 2, 9:00 AM

Sun, June 3 9:00 AM Rain or Shine, REGISTRATION DEADLINE: MAY 28

Belmar Spring Yard Sale

Carousel_image_b1a6c47aa5bd2064444a_lakecomoyardsale__2_

Sat, June 2, 9:00 AM

Sun, June 3 9:00 AM Rain or Shine, REGISTRATION DEADLINE: MAY 25

10th Annual Lake Como Yard Sale

Carousel_image_d910ca4289e03130c44b_bbppiratewalk2018

Sun, June 10, 12:00 PM

Pyanoe Plaza (starting location), Belmar

Belmar Pirate Walk

Host an International Exchange Student

May 19, 2018

 

EF High School Exchange Year announces annual search for student exchange host families in communities across the New Jersey

 

CAMBRIDGE, MA — EF High School Exchange Year has kicked off its annual nationwide search for caring host families to welcome exchange students into their homes, including 20 students to place in New Jersey. 

Last year, EF connected more ...

Belmar and Lake Como

May 11, 2018

Belmar Police Department reported the following arrests occurred in Belmar and Lake Como from April 1, 2018 to April 28, 2018.

BELMAR

Ryan Miles, 33, of Belmar was charged with contempt on an outstanding warrant after his arrest on April 1 on Route 35 by Police Officer Patrick McGill.

Lisa Perrault, 49, of Long Branch was arrested on 16th Avenue on April 6 by Police Officer Patrick ...

May is Skin Cancer Awareness Month

May 14, 2018

With warmer weather and sunny skies on the horizon, it is important to remember that skin cancer is the most common form of cancer in the United States. Skin cancer can greatly affect quality of life, and it can be disfiguring and even deadly. There are approximately 5.4 million cases of skin cancer diagnosed annually. Luckily, Skin Cancer Awareness Month provides a great time  to educate ...