Community Life

PSE&G to Upgrade Aging Gas Pipes in East Orange

18f77a8ff8edf48d60f0_Unknown.jpeg
18f77a8ff8edf48d60f0_Unknown.jpeg

EAST ORANGE, NJ – Public Service Electric & Gas Company (PSE&G) will be working in East Orange to replace a little over 2 miles of old gas pipes with new piping – ensuring a continued safe, clean and reliable gas system well into the future. Beginning in mid-March work will take place Monday through Friday between the hours of 7 a.m. and 5 p.m., and some Saturdays weather permitting.

The gas main replacement portion of the work is expected to take place in various locations in East Orange through the end of May. The paving and street restoration is expected to be completed in the fall of 2019.

“These upgrades are part of PSE&G’s three-year program to replace 510 miles of aging gas infrastructure throughout New Jersey,” said Joe Forline, vice president of gas operations for PSE&G. “After decades of being in the ground, old cast iron pipes can crack and unprotected steel may corrode. The new durable, plastic pipes will improve reliability, reduce the possibility of leaks, and ensure the continued safety of gas service for customers.” 

Sign Up for E-News

PSE&G is committed to keeping customers in East Orange informed about where and when the work will take place. Residents will be notified when work begins in their area by mail, door hangers and social media. Customers can find more information, including a list of streets, work time frames and video of how the work is performed at www.pseg.com/gaswork.  

If residents have questions or concerns about the work they can call our hotline at 1-833-661-6200.

How the work will be done

Before construction can start, the utility tests soil and digs test holes to verify the location of existing gas pipe. When this preliminary work is complete, PSE&G will begin installing the new gas lines.

  • To upgrade the gas lines, PSE&G digs trenches, primarily in road surfaces, and lays new pipes block by block to minimize disruptions. There will be short-term road closures and detours during construction. Local police direct vehicle and pedestrian traffic. At the end of each workday, the trenches are filled in and protective plates secured on any open areas so people can safely drive and walk. Customers always have access to their driveways. 
  • When possible, the utility does not dig on properties. If PSE&G does have to dig on a customer’s property, the utility restores any disturbance after the service line is installed. Grass areas are repaired and seeded, and concrete or asphalt openings are patched until final restoration work is scheduled.
  • After construction, a PSE&G technician needs to access the customer’s home to connect the service line and gas meter to the new gas main. The utility contacts homeowners to arrange a date and time to do the work. During this reconnection, customers can expect to be without gas service for about 4 hours. 
  • If a gas meter is inside, PSE&G relocates it to the outside of the customer’s home or business. A technician relights all appliances and makes sure they are working safely before leaving a home.

Public Service Electric and Gas Company (PSE&G) is New Jersey’s oldest and largest regulated gas and electric delivery utility, serving nearly three-quarters of the state’s population. PSE&G is the winner of the ReliabilityOne Award for superior electric system reliability. PSE&G is a subsidiary of Public Service Enterprise Group Incorporated (PSEG) (NYSE:PEG), a diversified energy company (www.pseg.com).

 

TAP Into Another Town's News:

You May Also Be Interested In

Sign Up for E-News

East Orange/Orange

Take the 2018 TAPinto Reader Survey

July 12, 2018

How often do you read TAPinto?  Have you downloaded the TAPinto APP?  These are a few of the questions for readers in our 2018 TAPinto Reader Survey.

We want to hear from you!

The survey will take less than five minutes to complete and will help TAPinto better serve you. 

Take the 2018 TAPinto Reader Survey.

Thank you.  We appreciate your support and ...

2nd Annual Love & Not Hate March Today in East Orange

July 13, 2018

EAST ORANGE, NJ - This morning the Rev. Al Sharpton will join East Orange Mayor Ted Green for their 2nd Annual Love & Not Hate March against gun violence at 8:00 AM. 

The March will begin at Hollywood Ave & Central Avenue in East Orange and will work its way to Oval Park. Once at the park there will be youth activities, vendors, music, school give-a-ways and much more.

Even More Valuable Case Study Topics

In the last article, we looked at finance and marketing topics that would make ideal case studies. This time, we want to continue looking at case studies that can help even complete beginners to the world of business improve their skills. We will look at customer relations, leadership and self-help topics.

Customer Relations

Customers are the lifeblood of any business, but it can be ...

More Essential Niches for Case Studies

Last time, we discussed how valuable business-related case studies can be in showing the way to success for aspiring entrepreneurs. In this article, we will be discussing two more important categories, finance and marketing. 

Finance

Finance case studies can offer valuable guidance for small businesses. Topics include:

* Budgeting

* Best accounting practices

  Automation ...

Winning Case Study Topic Areas

In the last article, we discussed why case studies can be an excellent opportunity to add income and prestige to your business. This time, we want to start taking a look at the kinds of case studies that people in your niche would be eager to see. 

Business Case Studies

Every small business can use a helping hand when it comes to laying a solid foundation for success. One of the most ...