Education

REBUILDING SHU: University Officials Say South Orange Zoning Restrictions a Challenge for Campus Projects

04f31d5e6048879dbcda_Zoning_Cross.jpg
The cross atop Walsh Library is at the maximum height for buildings allowed under South Orange zoning. Credits: Francis A. Raso
99130e1539b80fa8b866_Zoning_Low_Dorm.jpg
South Orange zoning regulations limit how many stories can be built. As a result, Seton Hall has no high-rise residence halls. Credits: Francis A. Raso
04f31d5e6048879dbcda_Zoning_Cross.jpg

SOUTH ORANGE, NJ – Operating within the strict zoning constraints of the village of South Orange may prove to be the toughest challenge facing Seton Hall University’s plans to rebuild its campus. 

The university has submitted five separate applications for campus rebuilding projects in just the past year, each one representing a major technical and regulatory challenge for the South Orange Village Planning Board, which has to review all plans.

  • REBUILDING SHU: Part 8 of 11. Seton Hall University embarks on the biggest campus renovation in a generation, hoping to make life better for students without making life worse for residents of South Orange. Read Part 7: History.

It is a titanic job for the members of the board, who serve part time while holding down other jobs. During their April 10 meeting, when Seton Hall officials again were presenting plans for rebuilding projects, members expressed their growing frustration with the university’s inability to produce a definitive master plan that includes all the new construction.

Sign Up for E-News

The university has had to shuffle its priorities several times as it tries to balance the availability of funding from the state with its own budgeting, as well as meeting the changing needs of its large and growing student body.  

However, the Planning Board’s patience seemed to run out. “I don’t understand why we are hearing this plan piecemeal,” said board member Michael Miller, who expressed the frustration of other members of the board. 

Beyond coordinating the presentation of plans for what is shaping up as the largest campus renovation in a generation, the university also has to try to comply as much as possible with zoning in South Orange, which is a predominately suburban residential village.

Individually, many of Seton Hall’s projects comply with basic planning and zoning requirements. But the projects can still conflict with one another. 

John Signorello, associate vice president of facilities and operations at Seton Hall, said the university does its best to satisfy zoning requirements regarding building height and setbacks.  But as the campus grows, new challenges arise.

“It becomes increasingly difficult when we’re on such a tight campus,” Signorello said. 

What might seem at first like a matter of individual taste, the location of a building, as well as its size, is strictly regulated by local zoning requirements. A building’s “setback” is its distance, measured in feet, from the property line, said Salvatore Renda, South Orange Village engineer and zoning official.  A property line is the boundary between two distinct properties. 

Any building in South Orange’s University Zone—essentially Seton Hall’s campus—can be constructed so that it is 30 feet high.  Each project is granted an additional 18 inches for every foot of building setback, for a maximum of 75 feet, according to Chapter 92 of the South Orange Village code. 

The crucifix atop Seton Hall’s Walsh Library signifies the absolute maximum height for any building on campus, university archivist Alan B. Delozier said. 

One exception to the rule involves “Special District A,” an area within the university zone that runs parallel to homes along South Orange Avenue and Centre Street. This zone includes buildings such as Newman and Cabrini halls, and enforces lower height restrictions on buildings, Signorello said. 

Lot coverage, another zoning term, can best be described as the percentage of a particular zone that—from an aerial view—is covered with buildings.  The village code allows the university zone maximum lot coverage of 30 percent.  Currently, building coverage accounts for approximately 24 percent (14 acres) of campus land, leaving the remaining space open for scenery, parking, and circulation, Signorello said. 

Renda said that proposed projects that conform to allowable zoning are presented to the Planning Board, whereas potentially problematic projects that don’t quite meet current zoning, are presented to the Zoning Board, or the Board of Adjustment. University representatives must stand before the appropriate board with its engineers, architects, designers and planners to provide justifications for any variances they may request. 

Signorello said the university does its best to avoid asking for variances, but sometimes the process cannot be avoided. The university’s request to purchase off-campus property in a residential zone on South Orange Avenue and Centre Street and convert it into an ROTC office building is one example of a project that was denied because it would have exceeded building height restrictions. 

After the appropriate local board has given citizens an opportunity to voice their concerns, the members rule in one of three ways:  approval, approval with necessary revisions, or denial. 

While public universities are not required to adhere to local zoning constraints, privately funded institutions such as Seton Hall cannot build without local approval. A bill currently making its way through the state Legislature, if passed, would exempt private colleges from obtaining such approvals from municipal government and grant them the same privileges given to public colleges under the New Jersey Municipal Land Use Law. 

The bill (S-1534/A-2586) says the delays stemming from the approval processes result in “the delay of important educational programs and facilities for students” and the “diversion of critical funding away from educational purposes.”

The bill’s opponents say residents living in the areas surrounding private institutions deserve a say in any developments that may impact their communities. The university’s proposal for a new university center, for instance, has led some local residents to sign a petition opposing the project, due to concerns that the plan’s service roads will interfere with traffic flow on South Orange Avenue. 

This series was reported and written by the Advanced Reporting class at Seton Hall University. This article was written by Francis A. Raso, a May 2013 graduate.

TAP Into Another Town's News:

You May Also Be Interested In

Sign Up for E-News

SOMA

AtlantiCast

AtlantiCast: Episode 15

On this week’s AtlantiCast, learn some important tips for controlling and avoiding diabetes from an Atlantic Health System expert, see how Atlantic Health is advancing cutting-edge research, hear what’s being done to keep health care environmentally friendly and much more!

 

South Orange Police Blotter - Two Arrested and Charged with DWI

May 24, 2018

South Orange Police Blotter as of May 24

Theft of Bicycle - A South Orange resident reported that sometime between 5:45 a.m. and 1:20 p.m., Tuesday, May 22, actor(s) unknown stole his black & white Gary Fisher mountain bike, which had been locked and secured to the bicycle rack under the main train station.

Commercial Burglaries - Two adjacent West South Orange ...

Maplewood Police Blotter - Two Motor Vehicle Thefts Reported, One Recovered

May 7 - Burglary; Sometime during the prior two days, entry was forced to a business on Newark Way.  The keys to a GMC van were then taken from inside the business and the van was stolen.

 

May 7 - Motor Vehicle Theft; At approximately 9:30 p.m., a Jeep left unattended and running in the parking lot of 7-11 on Irvington Ave was stolen. The vehicle was later recovered in ...

Maplewood and South Orange Events for Memorial Day Weekend - and What's Closed

May 24, 2018

MAPLEWOOD AND SOUTH ORANGE, NJ - There is a lot going on in the two towns this Memorial Day weekend, as well as some closures on Monday in observance of Memorial Day.

SATURDAY, MAY 26

The Maplewood Community Pool opens at noon for the 2018 season. (The South Orange Community Pool is opening June 2, details here.)

Downtown After Sundown presents "Jazz on ...

Maplewood Community Pool Scheduled to Open on Saturday, May 26

MAPLEWOOD, NJ -- The Maplewood Community Pool is scheduled to open this Saturday, May 26, and be open Saturday, Sunday, and Monday (Memorial Day) from noon to 6 p.m., according to an update from the Maplewood Recreation Department.

For those who wish to join the pool, registration can be done in person at the Recreation Department (574 Valley St.) on weekdays from 9 a.m. to ...

Upcoming Events

Carousel_image_982bc8344531b1a37c85_par_440

Fri, May 25, 7:00 PM

Par 440 Restaurant & Lounge, Short Hills

The Extra Rich In Class Dinner Show with E.R.I.C.

Arts & Entertainment Food & Drink

Carousel_image_af1b89eae735bf536426_par440_promo

Fri, May 25, 7:00 PM

Par 440 Restaurant & Lounge, Short Hills

The Extra Rich In Class Dinner Show with E.R.I.C.

Arts & Entertainment Food & Drink

Sun, May 27, 11:00 AM

The Ethical Culture Society of Essex County, Maplewood

Memorial Day Colloquy: What We Honor and How We ...

Other

Thu, May 31, 5:30 PM

Arden Courts, West Orange

Living with Alzheimer's for the Middle Stage ...

Education Health & Wellness

SURVIVING A STROKE: Quick Medical Response Gives Mom Her Life Back

Carotid artery dissection. It’s one of the most common causes of stroke in younger adults.

And while you might not associate the word “stroke” with younger patients, the condition – if not treated immediately – could lead to paralysis and even death.

Lindsey Singh can attest to the importance of immediacy. The 31-year-old mother of two from Flanders experienced ...

Domestic Violence Prevention Advocates SOFIA Honors Local Leaders During Annual Gala

May 24, 2018

WEST ORANGE, NJ - More than 200 supporters gathered at the Wilshire Grand Hotel in West Orange on Sunday to celebrate 9 years since the founding of S.O.F.I.A (Start out Fresh Intervention Advocates).

Founder Cynthia Walker and the gala committee of Chaz Moore, Kelly Moore, Lisa Boyd and Ida Walker pulled out all stops incorporating the color of purple throughout the venue for ...

Millburn Parents and Students Come Out to Board of Education Meeting to Push for Teacher Contract Resolution

MILLBURN, NJ -- Millburn school district parents and student representatives urged the Board of Education on Monday to quickly settle ongoing contract negotiations with the Millburn Education Association.

The prolonged deadlock between the board and the teachers’ union has lasted nearly a year has been bad for teacher morale and was beginning to take a toll on students, particularly at ...

A.J. Perri Helping Veterans in Need - Again

May 24, 2018

TINTON FALLS, NJ – A.J. Perri is back helping veterans in need – this time launching a search for veterans and their families through a partnership with ABC-TV.

As part of the A.J. Perri Cares Program, a lucky New Jersey veteran and their family will receive air conditioning/heating relief this summer.

"They fought for our country, and their families sacrificed," said ...

Vehicular Homicide Charges for Driver of Paramus School Bus

MORRISTOWN, NJ - The driver of a school bus involved in a crash on Route 80 last week that killed two people faces two counts of second-degree vehicular homicide/death by auto, it was announced today.

The driver, Hudy Muldrow, 77, of Woodland Park, attempted to make an illegal U-Turn on the highway in an attempt to find his way to Waterloo Village, the planned destination of the bus that was ...

Rocky Marciano, Jr. Unveils Rocky Marciano Wine at Par 440 on May 31

May 24, 2018

A Champion’s Commitment. The Taste of Excellence.

The wine will be unveiled at an invitation only event at PAR 440 Restaurant and Lounge in Short Hills, NJ, attended by Rocky Marciano, Jr.   

PAR 440 is the perfect venue for hosting the unveiling of the wine. The restaurant built by Mario LaVecchia, is decidedly modern with old school charm, and features amazing ...

Township of Maplewood: Notice of Public Meeting to Discuss Proposals for Pedestrian Safety Improvements and Traffic Flow Changes

A public meeting will be held on Thursday, May 31, 2018 at 7:30 p.m. at The Woodland, 60 Woodland Road, in the Great Hall, to present and discuss proposals for pedestrian safety improvements and traffic flow changes, including making Maplewood Avenue one-way from Baker Street to Lenox Place and reversing the direction of the NJT lot. Your presence is encouraged to apprise you of ...

Porchlight Post - Shedding Light On These Old Homes

You bought a new house (congratulations!) and its your first night in the new house. You get cozy and settle in for the night. Your husband wakes up early for work and then so do the kids. Its 5:30 a.m., and your hardwood floors creak so loudly it sounds like someone was trying to break-in. How did you not notice this before you moved in?

Or maybe you’ve been in your house for years and ...