Government

Gateway Hudson River Tunnel Project Inches Ahead

eea0eeccae56840b33b6_sompixgatewaytunnelproject.jpg
The Gateway project would double tunnel capacity for NJ Transit trains in and out of Manhattan on the Northeast Corridor Line. Credits: Courtesy Amtrak
eea0eeccae56840b33b6_sompixgatewaytunnelproject.jpg

WASHINGTON --The draft text of the fiscal year 2018 U.S. Department of Transportation Appropriations Act includes $900 million in new funding for the Gateway Hudson River train tunnel project.

“Congress is wise to invest in the Gateway tunnel proposal.  The Hudson River tunnel project is one of the most important infrastructure projects in the country, providing a critical link between New Jersey and New York where our regional economy contributes $3.7 trillion to the Nation's GDP,” said New Jersey Rep. Leonard Lance, R-7th.  “This is a major win for Garden State commuters."

Tuesday's announcement, coupled with passage of legislation signed into law by President Trump last spring providing additional funds for improvements to Amtrak’s Northeast Corridor, brings the combined federal support for the Hudson River tunnel project to nearly $1 billion.

Sign Up for E-News

Pre-construction cost estimates for the massive 10-year infrastructure project range between $11-13 billion.

Gateway is still in the planning and design phase.

Gateway is a comprehensive program of strategic rail infrastructure improvements designed to improve current services and create new capacity that will allow the doubling of passenger trains running under the Hudson River. The program will increase track, tunnel, bridge, and station capacity, eventually creating four mainline tracks between Newark, NJ, and Penn Station, New York, including a new, two-track Hudson River tunnel.

The program also includes updates to, and modernization of, existing infrastructure, such as the electrical system that supplies power to the roughly 450 weekday trains using this segment of the Northeast Corridor, and rebuilding and replacing the damaged components of the existing, century-old North River Tunnel, which was inundated with seawater during Super Storm Sandy.

By eliminating the bottleneck in New York and creating additional tunnel, track, and station capacity in the most congested segment of the Northeast Corridor, which runs between Washington and Boston, the Gateway Program will provide greater levels of service, increased redundancy, added reliability for shared operations, and additional capacity for the future increases in commuter and intercity rail service.

A series of public hearings soliciting comments and input on the $86M Gateway Project Draft Environmental Statement are scheduled as follows:

Aug. 1, Hotel Pennsylvania, Skytop Ballroom, 18th floor, 401 7th Ave. at 33rd St., New York City, 10001;

Aug. 3, Secaucus Junction Rail Station, Upper Level Long Hallway, County Road and County Avenue, Secaucus, 07094;

Aug. 10, Union City High School, 2500 Kennedy Blvd., Union City, NJ 07087.

Each hearing will include an afternoon and evening session, from 3-5 p.m. and 6-8 p.m. with a brief presentation about the Project at 3:15 p.m. and again at 6:15 p.m.

Members of the public are invited to provide an oral statement or to submit comments in writing. The hearing facilities will be accessible to persons with disabilities. Spanish and American Sign Language translators will be present. If other special accommodations are needed, contact the Project team at least five days prior to the hearings at 973-261-8115, or emailteam@hudsontunnelproject.com. For directions and parking information, please visit the Eventspage.

Further information is available on the website at hudsontunnelproject.com.

TAP Into Another Town's News:

Sign Up for E-News

Newark

Nation’s largest timber office building coming to Bears Riverfront Stadium site in Newark

February 5, 2018

Newark, NJ--Plans to develop the nation’s largest timber office building to be built on Newark's old Bears Riverfront Stadium and adjacent Lincoln motel sites were unveiled Monday by commercial real estate firm Lotus Equity Group.

The 11-story commercial office building, designed by Vancouver-based Michael Green Architecture, will anchor Riverfront Square—an ...

Britnee Timberlake Joins New Jersey General Assembly Replacing Sheila Oliver’s Post

January 30, 2018

Former Freeholder President Britnee Timberlake was sworn in Monday to fill the seat vacated by Sheila Oliver, who became the first black woman to assume statewide office in Garden State history when she became lieutenant governor earlier this month.

Timerlake, an East Orange resident, will represent the 34th District, which ...

Trees Have Sex? Rutgers Researchers Have All the Answers

February 22, 2018

NEW BRUNSWICK, NJ - A few years ago, Rutgers researcher Jennifer Blake-Mahmud was working on a botany project in Virginia when colleagues pointed out a striped maple, a common tree in the understory of mountain forests from Nova Scotia to Georgia. 

 

“They told me, ‘We think it switches sex from year to year, but we don’t know why,’ and I said, ...

Rutgers Union Rally Planned Friday for $15 Minimum Wage

New Brunswick, NJ - On Friday, February 23, student groups, a coalition of Rutgers unions, and representatives from campuses across the nation will hold a rally and march on College Avenue to demand a $15 minimum wage.

The action, initiated by the Rutgers chapter of United Students Against Sweatshops (USAS) and the Rutgers American Association of University Professors - American Federation of ...

Low-Income Families Who Need Safe Cribs Have Nowhere to Go

February 15, 2018

One recent email came from a pastor in East Orange, sharing the struggles of a young couple who have no safe place for their baby to sleep.

Then, there was also a phone call from a Newark hospital, making its fourth request in two years, as well as a frantic text from Puerto Rico, for a family who lost everything in the hurricane.

They all pleaded for the same thing: A safe crib for a ...