Transportation

UPDATE: Schedule Revised for Repaving of Somerville Streets

f5f0edcc0220183be691_sompixsteelplatesign.JPG
Credits: Rod Hirsch
b204d74ee379b714cf32_sompixsteelplate.JPG
Credits: Rod Hirsch
f5f0edcc0220183be691_sompixsteelplatesign.JPG

 

 

SOMERVILLE, NJ – No more ruts, no more steel plates, no more elevated manhole covers and no more dodging potholes on Bridge Street.

North and South Bridge Street, as well as several  less-traveled side streets throughout the borough, will be repaved beginning Tuesday, Sept. 5.

Earlier this week, it was announced that the repaving would begin Sept. 11. That has since been changed.

Sign Up for E-News

Electronic road signs adjacent to the Somerville Police headquarters at 24 So. Bridge St., and further south near the Route 206 intersection are flashing the message: “9/5-9/7 Paving and Milling 8 p.m.-6 a.m. Plan Alternate Route.”

PSE&G began work in April breaking up the roadway surfaces to excavate and remove old cast iron pipes to be replaced with upgraded plastic and coated steel piping designed to be more durable and longer-lasting.

Once the replacement lines were installed and the excavations filled in, those portions of the roads dug up were paved over, leaving an uneven surface for vehicles to drive over.

With the infrastructure work completed, PSE&G will return to the borough to smooth things over.

The borough is advising residents that there will be more inconvenience, as there will be road closures and detours, which may prevent access to residences and businesses, according to an advisory from info@somerville.com.

Here is the revised paving schedule and roads affected as provided by the borough:

Week of Sept. 4:

 - North Bridge Street from Route 22 to East Summit Street - paving will be done during day time hours;

- South Bridge Street from West Main Street to 5th Street - paving will be done during evening hours.


Week of Sept. 25:

All paving will be done during day time hours:

Ivanhoe Avenue; Young Street; South Street; Holly Glen; 4th Street; North Bridge Street (between Summit Street and High Street); North Bridge Street between High Street and Main Street).

TAP Into Another Town's News:

You May Also Be Interested In

Sign Up for E-News

Somerville

Somerset County Corrections Officers Overcome Obstacles in Battle of the Frontlines

June 20, 2018

 

SOMERVILLE, NJ - Four Somerset County Corrections Officers competed in the Police Fitness & Nutrition and City Challenge Race “Battle of the Frontlines” held at Laurel Hill Park in Secaucus.

“I am very proud of my Corrections staff for taking the initiative in working on their fitness and representing our organization,” Sheriff Frank J. Provenzano ...

Overlook President Lieber Joins Imagine Leadership Council

June 8, 2018

MOUNTAINSIDE, NJ - Alan Lieber, president of Overlook Medical Center, has joined the Leadership Council of Imagine, a Center for Coping with Loss, the Mountainside-based nonprofit that offers free, year-round peer grief support for children, young adults and parents / guardians who have had a parent, sibling or child die, as well as support groups for caregivers of an adult or ...